Name
Phone
Email
Address
City
State
Zip
Winterization After Date
Boat Make and Model
Location (Dock Name and Slip Number)
Key Location
Engine(s): How many to be winterized?
Water System yesno
A/C-Heat System yesno
Hot Water Tank yesno
Ice Maker yesno
Generator yesno
Holding Tank(s) yesno
Ballast Pumps and Bags yesno
No Winterization requests accepted after October 31, 2026.
Keys must be available at time of services. If no keys are available a charge of $150 will be applied.
No service performed without completed winterization form.
Additional services such as oil changes, water pump impeller service and lower unit service available in the spring of 2027. No additional services will be performed at winterization.
Engine and generator winterization charges are $229 per engine and/or generator for boats less than 20 years old. Boats greater than 20 years old charged at $299 per engine and/or generator.
Water systems, A/C, head systems, hot water tanks, ice makers, holding tanks, ballast pumps and bag winterization charges are $229 per hour for boats less than 20 years and less in age. Hourly charges are $299 for boats greater than 20 years.
Gray Water holding tanks requiring pump out will require travel to the closest marina facility with pump out capability. Charges of $175 per hour for time required to travel to and from marina with pump out capability, plus pump out time required, plus any marina service charge and/or disposal fees will apply.
QuikStor fuel stabilizer added to all fuel systems at $21.99 per pint.
Non-toxic anti-freeze as required $24.99 per gallon.
WINTERIZATION SERVICES ARE PERFORMED ON A FIRST COME-FIRST SERVED BASIS. NICHOLS MARINE ASSUMES NO LIABILITY OR RESPONSIBILITY FOR SERVICES PERFORMED AFTER FIRST FREEZE.
Card #
Zip Code
Expiration Date
CVV
Authorized Signature
BY SUBMITTING BELOW I HEREBY AUTHORIZE NICHOLS MARINE TO PERFORM THE WORK STATED AND I HEREBY ACCEPT THE TERMS DESCRIBED. AUTHORIZATION IS ALSO MADE TO PROCESS THE CREDIT CARD STATED ABOVE, OR ONE CURRENTLY ON FILE AT NICHOLS MARINE, FOR THE WORK PERFORMED.
Completion Date